For Members: Presidio Tunnel Tops Preview, April 13
Presidio Main Post

Get an insider's view of the Presidio Tunnel Tops Project which will create 14 new acres of parkland above the Presidio Parkway (Doyle Drive) tunnels and connect the Main Post to Crissy Field. We'll share the latest design for Tunnel Tops, discuss many of the planned features, and preview the brand-new Presidio Visitor Center.

This event is for Parks Conservancy members only—if you are not a member, you can join online here or contact us at (415) 561-3060 to become a member and sign up for this event by phone.

Date:
Time: 3:30 PM - 4:30 PM
Address:
103 Montgomery, the Presidio Main Post
San Francisco, CA 94129

We're sorry, the deadline for registering for this event has passed.